Application instructions:
1. Surface preparation:Correct substrate preparation is critical for optimum performance. Surfaces should be sound, clean, dry and free from loose particles, oil, grease, and all other contaminants;
2. Primer: Mix JD-D
Inspection standards for the primer: even film with certain brightness.
3. Undercoat: Mix JD-D
Inspection standards for the undercoat: Non-sticky to hand, no softening, no nail print if scratch on the surface.
4. Putty: Grind with 325# sand paper and remove the ash. Mix JD-D
Inspection standards for the putty: Non-sticky to hand, no softening, no nail print if scratching on the surface.
5. Finish coating: Grind with 325# sand paper and remove the ash. Mix JD
6. Maintenance: 5-7 days. Don't use or wash by water and other chemic
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |