Application Flow:
1. Substrate preparation: Correct substrate preparation is critical for optimum performance. Surfaces should be sound, clean, dry and free from loose particles, oil, grease, and all other contaminants
2. Primer: Mix JD-D
Inspection standards for the primer: even film with certain brightness.
3.Undercoat: Mix WTP-MS A and WTP-MSB based on 3:1. Stir the mixture well and then apply. After it hardens, wait for 12 hours to continue the next process.
5. Finish: Mix JD
Inspection standards for the putty: even film, no bubbling, uniform color and good scratch resistance.
Maintenance: 5-7 days. Don't use or wash with water and other chemicals.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |