social house (13)
Luxury Villa (54)
Football house (4)
Bungalow (82)
Wooden Bungalow (20)
Apartment Building (17)
Mobile House (24)
Modular House (28)
Lotus House (14)
Containerized House (15)
Shed (20)
Aapartment modular building ningbo:beautiful low cost prefab house: is based on light gauge steel frame system with high performance finishing materials. The whole house can be assembled within couple of hours by 4workers.
How To Assemble On Site:
Design code:
(1)AISI S100 North American Specification for the Design of Cold Formed Steel Structural Members published by the American Iron and Steel Institute (AISI) in the United States.
(2)AS/NZS 4600 Australian/New Zealand Standard-Cold-formed steel structures jointly published by Standards Australia and Standards New Zealand.
(3)BS 5950-5 Structural use of steelwork in building-Part 5. Code of practice for design of cold formed thin gauge sections published by BSI in the UK.
(4)ENV1993-1-3 means Eurocode 3: Design of steel structures; Part 1.3: General rules, Supplementary rules for cold-formed thin gauge members.
Why Choose Light Gauge Steel Structure?
1)Lifetime for structure: 100 years.
2)Earthquake resistance: mix more than 8 grades.
3)Wind resistance:max 60m/s.
4)Fire resistance:all the materials used can be fire resistance.
5)Snow resistance:max 2.9KN/m²as required
6)Heat insulation:100 mm in thickness can match 1 m thickness of brick wall.
7)High acoustic insulation:60db of exterior wall 40db of interior wall
8)Insect prevention: Free from the damages by insects, such as white ants
9)Ventilation:a combination of natural ventilation or air supply keep the indoor air fresh and clean
10)Packing and delivery: 140SQM/ 40'HQ container for structure only and 90SQM/ 40'HQ container for structure with decorate materials.
11)Installation:the average is one worker one day install one SQM.
12)Installation guide:dispatch engineer to guide on site.
Technology Details:
Material Configuation:
ISO standard light gauge steel for main structure.one or two also three floors available.fireproof,heat insulation,wind and earthquake resistance.green,energy save. economically.
No.
Item
Materials
Social house
No.
Item
Materials
Social house
1
Foundation
Fixing to Foundation
chemical bolt
6
Roof system
roofing
steel roofing sheet
cushion tape between frame and foundation
asphalt tape
water-proof layer
NULL
2
House Structure System
Main sturcture for house
0.75mm thk *89mm wide Steel frame
strength board
NULL
Floor Joist (if multi stories)
0.75mm steel joist
Insulation/batt
low denisity glass wool
Connection
self-drilling scress
eaves board
6mm MgO board
3
Exterior Wall
Ext. wall Cladding
9mm MgO board or steel cladding
downpipe system
PVC downpipe system
Reinforce layer
NULL
7
Kitchen and bathroom
Kitchen cabinet
low cost cabinet
Vapor barrier
low cost Vapor barrier sheet
wall cabinet
null
Insulation/batt
null
counter top
low cost arclic top
inter of ext .wall
9mm plaster board
Sink
one bower stainless sink with faucet
4
Interior Partition wall
siding
9mm plaster board
toilet
low cost toilet
cornering
NO
bathtub
no
Skirting
low cost Plywood and PVC
shower
low cost shower
5
Floor System
sub floor for ground floor (Wet area )
NULL
8
Doors and windows, plumbing
Exterior door
low cost steel door
Sub floor for other floor ( Wet area )
18mm MgO
windows
PVC sliding windows
flooring for gound floor (dry area)
No
interior door
plywood door
flooring for gound floor ( wet area)
NO.
hot&cold water pipe
low cost PPR PIPE
Flooring for other floor (wet area)
low cost tile
Downpipe
PVC downpipe
Flooring for other floor dry area
low cost PVC flooring
9
Electrical system and multi media
telphone cable
prepunch whole
Insulation
NULL
TV. CABLE
prepunch whole
Ceiling for dry area
9mm plaster board
internet cable
prepunch whole
ceiling for wet area
9mm plaster board
electrical cables
NULL
stairs (If have)
steel stairs
lighting
NULL
notice:
distribution box
NULL
1
EX.W mean EX.works, pls find explaination from wikipedia
switch
NULL
2
This price does not include foundation ,cement works and any other cost.
11
Others
INSTALLATION FEE
Optional
3
This price does not include design fee.
SUPERVISOR
Optional
4
This price does not include any furnitures and others.
5
This price is only for listed materials
6
All electrical is based on Chinese standard equipments.
7
The total widnows area is no more than 15% of building area. The ceiling height is calculated 2.5m.
8
Final price need to be confirmed based on final drawings and order-confirm-letter.
9
If you have any questions, pls contact DEEPBLUE.
Deutsch
|
Español |
Français |
Italiano |
Português |
日本の |
한국어 |
العربية |
български |
hrvatski |
česky | |
Dansk |
Nederlands |
suomi |
Ελληνικά |
हिन्दी |
norsk |
Polski |
Română |
русский |
Svenska |
中文 |