Site Map |   
Jijia Optoelectronic Technology Co., Ltd.

Supplier Details

    Bookmark this page

    Home > News > Thailand 5 years electric power development plan to promote popularization LED bulbs

    Thailand 5 years electric power development plan to promote popularization LED bulbs

    In order to improve the power supply capacity, save electricity and strengthen environmental protection, and Thailand will be increased power generation capacity and popularization LED bulbs in terms of both, to practical results.
    National power bureau chief said, in the national energy supply development plan, 70% of electricity from natural gas to generate electricity. In order to avoid cause national power into passive natural gas resource increasingly drying up, need to increase the proportion of coal electricity generation. For this, the national power authority has developed from 2013 to 2017, power plants and power supply system five years development plan, the total budget is 300 billion baht, 60% were power plant investment, while 40% for investment of power supply system. Four coal-fired power plants, a total of 7 units and 1 hydroelectric power station unit 2 in the reconstruction after the expansion, will greatly reduce the coal consumption and the cost and increase the generating capacity.
    Thailand, meanwhile, power bureau decided after trial and error, will be held across the country this year on expanding our scope of trial LED energy-saving lamps, strive to promote unity throughout the country use LED bulbs.

    Contact us

    Minimize
    We are online!