Site Map |   
XIAMEN XDE M AND E EQUIPMENT CO.,LTD.
1. Asphalt Mixing Plant – Construction Equipment     2. Asphalt Hot Mix Plant – Significant Equipment of Road Construction Industries     3. Best Concrete Mixers Are Good For Your Job     4. You Should Know The Basic Information Of Concrete Mixers     5. What's The Technical Specification Of Asphalt Mixing Plants     
Product Catalogue
Asphalt Mixing Plant
SHLB Series double drum mobile asphalt mixing plant
LQY Series mobile asphalt mixing plant
LB Series stationary asphalt mixing plant
Concrete batching plant
HZS series modular concrete batching plant
YHZS series mobile/portable concrete batching plant
HZSR ready mix concrete mixing plant
Stabilized soil mixing plant
WBS series stabilized soil mixing plant
YWBS series mobile stabilized soil mixing plant
Supplier Details
Company Name: XIAMEN XDE M AND E EQUIPMENT CO.,LTD.
Contact Person:Jessica Hua
Tel: 86-591-3975999,15960821355
Fax: 86-591-3975777
Email: marketing@cnxdmac.com
Address: Unit (03,04)-1,25/F,No.253,South Hubin Road,Siming District,Xiamen,Fujian.
WebSite: http://www.yeskey.com/space/xmxde4455/
http://www.cnxdmac.com
http://www.xdemachinery.com
http://blog.xdemac.com
Bookmark this page
What is the reason cause Insufficient compaction of asphalt concrete pavement Home > News
Phenomenon: compaction does not meet specifications. In the face of insufficient compaction layer, thin strips of wood with a fingernail or the surface of the pellets dial LO pick, the pellets are loose or provoke the phenomenon.

Analysis: The master rolling speed, rolling mobile asphalt mixing plant method is wrong. Asphalt mixing temperature is too high, there are scorch phenomenon, asphalt adhesion loss, despite repeated rolling, but the integrity of the surface layer is not good, still half loose state. When the surface layer of compacted asphalt mixture temperature is low, although the asphalt cover wrap is good, but has been gradually losing sticky asphalt compaction was loose in the state, it is difficult compaction molding. Rainy construction, asphalt water film is formed, the impact of mineral aggregate and asphalt binder and asphalt mixture between RCC, the moisture evaporates water vapor formed by the closure, affecting the pavement effectively compacted. Compacted thickness is too large or too small.
Deutsch Español Français Italiano Português 日本の 한국어 العربية български hrvatski česky
Dansk Nederlands suomi Ελληνικά हिन्दी norsk Polski Română русский Svenska 中文
Home | Products Show | What's New | Company Profile | Contact us | Site Map | Link
Friendly Link: Link
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0~9 |
Copyright © XIAMEN XDE M AND E EQUIPMENT CO.,LTD. All rights reserved.

Contact us

Minimize
We are online!