PP204 plastic moulding
  Posting Date : 2024-05-03 19:27:25

Detailed Product Description

PP204 plastic moulding

 

We can make all kinds of plastic mould based on customer's drawing or sample. 

The following is mould information for your reference:

Plastic Injection Mould Specification Sheet

Item

Description

Mould Material

C45, P20, 718, 2738, Nak80, S-7 etc.

Mould Base

LKM, HASCO,

Standard Mould Parts

DME, HASCODME, HASCO     

Cavity

Single / Multiple

Injection System

Cold / Hot Runner

Runner

Yudo, DME, HUSkY

Mould Life

1,000,000 shots and up

Plastic material

PP, ABS, HDPE, PC, PVC ect

Design Software

UG, PROE, Cimatron, Solidwork ect

Delivery Time

20-45 days

Payment

By T/T

 

1. Received inquiry

By email, Online Talking, or telephone call.

2. Quote within 24 hours

Send you quotation sheet with all details information

2. Negotiation

About quality, price, delivery time, payment, shipment ect.

3. Place an order

According to customer's requirement to make mould.

4. Drawing

Customer confirm the final drawing.

5. Mould

Prepareing steel, shaping, Surface grinder, dowel pin drilling, datum axis, CNC, Milling, Wire Cutting, EDM, Benching, Polishing

6. Sample 1st Trial

If the 1st sample is not satisfied cusmter, we modify the mould until meet customer's satisfactory.

7. Confirm the final Sample

Check and approve the sample.

8. Delivery

By Sea or by Air. According to customer's requests.

 

1.The production can be designed and made according to the 2D or 3D drawing ,or the sample which provided by the customers .

 

2. We use many kinds of world-wide applied mould steel material such as 718,2378,H13,P20,NAK80,45#,50# etc

 

3.Mould base and standard components come from LKM, LYM,DME etc

 

4. We use various plastic material such as PP, PE ,PU,PC, PVC, POM , PA6, ,PBT , ABS, PMMA etc.

 

5.We provide advanced R&D technology and rapid prototype service

 

6.We offer unique solutions to your products with good quality, good price, good service

 

7. We sincerely welcome OEM/ODM project

 

8. Packing follows to customer's requirement

 

9.Good After-sale service

 

10.Delivery time will be 4-7 weeks according to different product

 

 
Contact Information
Contact:Lana Jin
Telephone:18950033912
sunnyindustry@126.com
Dian Qian Industrial Zone, Huli District, Xiamen,Fujian , China